EL 81{
} PROJECT LABORATORY
CONTRACT – Fall
2006
Student
Name:___________________________________________ Group:_______
If you
have completed EL 81 classes in the past, list the name(s) of your previous
project(s):
First Project:_______________________ Second
Project:________________________
Advisor’s
Notes and Additional Requirements:_______________________________
_______________________________________________________________________
I agree
to the above project requirements. I have received and read the
handout for this course and understand the criteria by which the
project is graded. I understand that there will be a one letter
grade reduction for each due date that is not met.
I will make an appointment to see my advisor before each of the
due dates below. If my project uses
an AC line cord it must be a 3-wire grounded cord with the ground
attached to the metal case of the transformer and metal project case. I MUST have any AC operated projects inspected
by the instructor before power is applied. If
I have any doubts about safety, I will ASK! I agree to
submit this contract to obtain advisor’s initials by each due date, as
indicated below. I understand that it is
my responsibility to drop if I choose not to attend, and that the
instructor will NOT drop me.
Student Signature:
_________________________________ Date: _______________
Time
Line: The project will be accomplished in
the following stages:
Due Date |
Requirements |
Advisor’s Initials and Date Completed |
|
Deadline to submit project proposal. |
Letter Grade
Reduction for Late proposal. |
|
|
Deadline
to show parts before assembly is undertaken. |
Letter Grade
Reduction |
|
|
Last
date to obtain assistance from advisor in “fixing” or completing your
project! You must work on your own after this date. |
No advisor initials required at this step. Just note that after this date the advisor is
no longer available to help you if your project is not working. You will need to fix these on your own! |
|
|
Deadline
to demonstrate Completed and Working Project without grade
penalty |
Projects
demonstrated after this date will be assessed a 10% grade reduction. |
|
|
Last
date to demonstrate Completed and Working Project while
incurring a 10% grade penalty. |
|
|
|
Last
date to submit Final Report |
Final Report
is worth 10% of grade. (1 Letter) |
Please
note again that your advisor can not provide any assistance in helping
to make your project operational after November 16, 2006 and all work
for this course is due on or before Dec 14, 2006.